Sheffield
Trucks are restricted in Kathmandu during the day. Leave the hub at 4–5 am and come back into the city in the evening or at night.
Open for cars. Not yet confirmed for trucks – use the old Nagdhunga road unless the driver confirms.
The weakest bridge (Betrawati) takes 40 t. A normal loaded truck is fine. Roads to schools: 4x4 or tractor.
Total time “now” comes from our route research. It is split between towns in proportion to normal driving time on each stretch. Treat clock times as a plan, not a promise.